Residential demolition
Demolition for homes, extensions and residential structures, with the scope, access and site clearance agreed before work begins.

Making room for what’s next.

From a single room to a complete strip-out. Demolition and clearance to get your renovation moving.
Book a free site visit and project scoping survey to discuss the work, access and clearance requirements.
Subject to availability within our service area. Specialist asbestos surveys, sampling and testing are separate and may be chargeable; any costs must be agreed first.Residential and commercial demolition, strip-outs and clearance for homeowners, businesses and contractors.
Demolition for homes, extensions and residential structures, with the scope, access and site clearance agreed before work begins.
Demolition and strip-out services for commercial premises, from offices and retail spaces to wider redevelopment projects. Scope, access, protection and clearance arrangements are agreed before work starts.
Removal of non-structural partitions, wall finishes and ceilings, subject to a suitable assessment.
Remove old units, fixtures and finishes so your installation team can begin the next stage.
Lift carpets, underlay and selected floor finishes as part of your refurbishment scope.
Discuss shed dismantling and the removal of unwanted garden materials and debris.
Plan removal of demolition waste alongside the job, with access and disposal requirements agreed in advance.
Removal of suitable asbestos-containing materials by our team trained in non-licensed asbestos work, subject to assessment of the material, condition and work method. Work requiring an HSE licence must be handled by an HSE-licensed contractor.
Check the next step for your project ↗A closer look at demolition, material processing and demolition works in progress.


Drag the handle to explore the difference a cleared space makes.
Peace of mind when planning your residential or commercial project. Contact our office to discuss your project’s insurance documentation requirements.
Demolition-specific training and non-licensed asbestos removal training across our team. The material and planned work must still be assessed to confirm the correct asbestos work category; licensable work requires an HSE-licensed contractor.
Before work starts, we agree what needs removing and what needs protecting. We review access, parking, working hours, waste removal and any survey or service-isolation requirements, then plan the sequence around your project and the trades following us.
Share your location, photos and a description of the work. Include access and your preferred dates.
Confirm the scope, any site visit needed, service isolation and waste arrangements before work starts.
Carry out the agreed removal and clearance so your project can move forward.
We cover the whole of London and Greater London, Maidstone, Surrey and the South East coast, including Brighton and the towns and villages in between. Include your postcode so we can plan the practical details of your project.
Counties & areas: The whole of London and Greater London, Surrey, Maidstone in Kent, and locations along the South East coast, including Sussex and Brighton & Hove.
Planning a project in these areas? Include your postcode in the quote form.
Our coverage includes all of London and Greater London, Maidstone, Guildford, East Grinstead and the South East coast. The solid red outline and shaded area show our indicative coverage; include your postcode when enquiring.
Loads OpenStreetMap tiles from an external provider, which receives your IP address. No map tiles load until you choose to enable them.
Not sure who you need? Answer a few questions to find the appropriate assessment route before work begins.
This guide cannot identify asbestos or authorise work. A competent contractor must assess the material, condition and planned method. Do not disturb or sample suspected material yourself.
Based on HSE licensing guidance ↗ · Reviewed 20 October 2026.
A little preparation makes a big difference.
The price depends on the scope, access, waste volume, materials and any specialist requirements. Share photos, a postcode and what needs removing so the work can be assessed and a written quote prepared.
Depending on the building and location, demolition may need planning permission or prior approval. Building-control notification and permits for a skip or highway occupation may also apply. Check with your local council before work starts; listed buildings and conservation areas have additional controls. Read Planning Portal guidance ↗
Work affecting a shared wall or structure, or certain excavations near a neighbour, may fall under the Party Wall etc. Act 1996 in England and Wales. Ask a party wall surveyor before scheduling work. Party wall procedures are separate from planning and building regulations. Read GOV.UK guidance ↗
Timing depends on the amount of removal, access, working-hour restrictions, surveys and waste arrangements. An estimated programme can be agreed once the scope has been assessed. Required notices or specialist work can affect the start date.
Stop work in the affected area and prevent further disturbance. Arrange competent assessment and, where necessary, a suitable survey or testing. Higher-risk work requires an HSE-licensed contractor; some lower-risk work is non-licensed or notifiable non-licensed. Work should resume only after the appropriate arrangements are confirmed. Read HSE guidance ↗
Waste removal can be included in your quote. We’ll agree what needs taking away, how it will be loaded and any exclusions before work starts. Suspected asbestos needs a separate assessment and appropriate disposal arrangements.
Practical guides for projects across London, Greater London, Maidstone and the South East coast.
Site visits take place at your project location. Call our office on 020 8287 9283, between 8am and 6pm, to discuss your project.
Tell us what you need, add site details and photos, then leave your contact information. Three short steps to prepare your enquiry, including a request for a free site visit.
Tap the bucket button or building to bring it down.
Ready when you are · 0% cleared
Just for fun · Tap to wreck. Rebuild to play again.